Skillbuilder
   My Account  |  Cart Contents  |  Checkout   


Installation of Putting Green

You may view the instructions online or Download them in PDF.


You can install your putting green using a base of concrete, asphalt, crushed rock &  crushed limestone or just crushed limestone.   Concrete is the best and also the most expensive.  Most people prefer to construct their base using crushed limestone because it is the most economical.  When using a concrete base, you should follow the appropriate steps below. The concrete should be formed to comply with the desired size of the putting green and step 5 should be done before the concrete hardens. You should also consider the contour of the putting green before pouring the concrete.

Installation of our putting greens using the crushed limestone base is as easy as 1, 2, 3.  The instructions make the installation simple and easy to enable the average home owner to install it himself.  Installation of the putting green usually takes one day, and you probably already own most of the tools needed.

Simply click on the links below to view the easy steps to your putting green and/or sand trap. 

Note: All turfs will expand and contract to some degree based on temperature conditions.

Installation Steps

Tools and materials required

Step 6 - Dressing the Sub-Base

Step 1 - Determine a location

Step 7 - Join two rolls of turf (if applicable)

Step 2 - Clear the area for the sub-base

Step 8 - Shape and secure the putting green

Step 3 - Distribute the sub-base material

Step 9 - Fill the putting green with sand  (for turfs requiring sand fill)

Step 4 - Compact the sub-base material

Step 10 - Cut holes for the cup

Step 5 - Install the cups

Step 11 - Landscaping the Turf



 Directions for building your sand trap and tools and materials needed

All Selections and Pricing of Putting Greens

 

Copyright © 1995 - 2007 Skillbuilder, Inc.
eXTReMe Tracker